{"contenttype":"article","language":"fr","availableLanguages":"de,en,es,fr,it,pl","rcn":"224911","id":"224911-lowcost-offshore-wind-energy","title":"\u00c9nergie \u00e9olienne offshore \u00e0 bas co\u00fbt","teaser":"Un projet financ\u00e9 par l\u2019UE a introduit de nouvelles strat\u00e9gies et des outils de pointe pour r\u00e9duire les co\u00fbts des projets de parcs \u00e9oliens offshore et accro\u00eetre leur comp\u00e9titivit\u00e9.","body":"\u003Csection\u003E\u003CsectionBody\u003EL\u2019\u00e9nergie \u00e9olienne offshore est une composante \u00e9nerg\u00e9tique importante qui pourrait contribuer \u00e0 garantir les engagements de l\u2019Europe en mati\u00e8re de changement climatique, de s\u00e9curit\u00e9 \u00e9nerg\u00e9tique et d\u2019\u00e9conomie \u00e0 faible \u00e9mission de carbone. Une r\u00e9duction continue des co\u00fbts est hautement n\u00e9cessaire pour exploiter pleinement le potentiel des ressources \u00e9oliennes offshore et r\u00e9aliser les b\u00e9n\u00e9fices socio-\u00e9conomiques de ce secteur enti\u00e8rement industrialis\u00e9 et \u00e9mergent. \n\nIl est fort probable que l\u2019int\u00e9gration logistique et les optimisations dans la cha\u00eene d\u2019approvisionnement, l\u2019installation, l\u2019exploitation et la maintenance aideront \u00e0 atteindre ces objectifs de r\u00e9duction des co\u00fbts. L\u2019objectif principal du projet http:\/\/www.leanwind.eu\/ (LEANWIND) financ\u00e9 par l\u2019UE \u00e9tait de mettre au point des technologies et des strat\u00e9gies pour contribuer \u00e0 la r\u00e9solution des probl\u00e8mes actuels et \u00e0 venir de ce secteur et de produire des outils int\u00e9gr\u00e9s permettant une analyse du co\u00fbt du cycle de vie complet et logistique. \n\nLe consortium dirig\u00e9 par l\u2019University College de Cork s\u2019\u00e9tend sur 11\u00a0pays diff\u00e9rents et rassemble des experts de plusieurs secteurs. il s\u2019agit notamment des secteurs p\u00e9trolier et gazier, maritime, du transport et \u00e9olien offshore ainsi que des repr\u00e9sentants de toute la cha\u00eene d\u2019approvisionnement: promoteurs, services publics, fournisseurs de turbines, armateurs, constructeurs de navires, soci\u00e9t\u00e9s de classification et universitaires.\n\nLa fin du gaspi\n\nComme son nom le sugg\u00e8re, LEANWIND \u2013 litt\u00e9ralement vent l\u00e9ger \u2013 cherchait \u00e0 tirer parti des m\u00e9thodologies Lean \u2013 une m\u00e9thode syst\u00e9matique de minimisation des d\u00e9chets inspir\u00e9e de l\u2019industrie japonaise \u2013, fruit des d\u00e9cennies d\u2019exp\u00e9rience des autres secteurs industriels. \u00abLa pens\u00e9e Lean fait r\u00e9f\u00e9rence \u00e0 un processus dynamique, fond\u00e9 sur les connaissances et ax\u00e9 sur l\u2019utilisateur final appliqu\u00e9 par une industrie pour \u00e9liminer les \u00e9tapes inutiles et rationaliser les processus. En fin de compte, il s\u2019agit de cr\u00e9er de la valeur\u00bb, explique le chef du projet Jimmy Murphy. L\u2019introduction du processus Lean dans l\u2019industrie \u00e9olienne offshore est une nouveaut\u00e9 dans ce domaine.\n\nLe consortium a appliqu\u00e9 ce nouveau paradigme Lean \u00e0 chacune des phases critiques du projet: conception de la sous-structure et du navire, logistique du parc \u00e9olien, exploitation et maintenance, et enfin sant\u00e9 et maintenance. L\u2019approche LEANWIND garantit que les \u00e9tapes inutilement complexes ou inefficaces du processus de d\u00e9veloppement sont supprim\u00e9es, que le flux entre les \u00e9tapes n\u00e9cessaires est rationalis\u00e9 et que la qualit\u00e9 est am\u00e9lior\u00e9e. L\u2019am\u00e9lioration globale des co\u00fbts et de l\u2019utilisation du temps permettra \u00e0 l\u2019industrie de maintenir sa comp\u00e9titivit\u00e9 actuelle en mati\u00e8re de co\u00fbts dans des environnements d\u2019exploitation plus difficiles. Correctement appliqu\u00e9e, la gestion Lean am\u00e9liorera la qualit\u00e9, la fiabilit\u00e9 ainsi que les normes de sant\u00e9 et de s\u00e9curit\u00e9 tout au long de la cha\u00eene d\u2019approvisionnement du projet et du cycle de vie du parc \u00e9olien.\n\nConcepts, outils et strat\u00e9gies innovants\n\nLe passage \u00e0 de plus grandes profondeurs d\u2019eau avec des turbines plus grandes repr\u00e9sente la prochaine grande \u00e9tape pour la production d\u2019\u00e9nergie \u00e9olienne offshore. Le projet LEANWIND visait \u00e0 maintenir les \u00e9conomies de co\u00fbts et d\u2019efficacit\u00e9 au long de l\u2019\u00e9volution de l\u2019industrie vers des sites plus extr\u00eames et des turbines plus grandes. La production d\u2019\u00e9lectricit\u00e9 \u00e9olienne offshore en Europe devrait atteindre 23,5\u00a0GW d\u2019ici 2020.\n\nPour l\u2019installation et le d\u00e9mant\u00e8lement, les partenaires du projet ont mis au point de nouvelles fondations et de nouveaux navires qui am\u00e9liorent l\u2019efficacit\u00e9 et favorisent l\u2019utilisation de processus Lean. Apr\u00e8s la s\u00e9lection de sites de test repr\u00e9sentatifs des fermes actuelles et \u00e0 venir, les partenaires ont d\u00e9velopp\u00e9 avec succ\u00e8s des sous-structures telles que des monopiles XL, des fondations gain\u00e9es et ballast\u00e9es pour une turbine de 8\u00a0MW et un concept flottant pour une turbine de 5\u00a0MW. Ces concepts plus l\u00e9gers mais tout aussi stables permettent de r\u00e9duire les co\u00fbts de mat\u00e9riaux et de r\u00e9duire au minimum le besoin en navire transporteur de charges lourdes.\n\nDans le cadre des op\u00e9rations d\u2019exploitation et de maintenance, les d\u00e9veloppements du projet comprenaient de nouveaux outils de planification et d\u2019organisation quotidienne, des strat\u00e9gies de maintenance bas\u00e9es sur les risques, un logiciel de surveillance de l\u2019\u00e9tat et un dispositif de pr\u00e9sence \u00e0 distance. Ensemble, ils permettent de r\u00e9duire le besoin de pr\u00e9sence physique dans les parcs \u00e9oliens, r\u00e9duisant encore les co\u00fbts et les risques. En outre, la conception d\u2019un nouveau navire d\u2019exploitation et de maintenance facilitera les activit\u00e9s du personnel, les fermes s\u2019\u00e9loignant encore davantage du rivage. Les caract\u00e9ristiques incluent une importante capacit\u00e9 de personnel et une passerelle \u00e0 mouvements compens\u00e9s permettant un acc\u00e8s au site avec des vagues jusqu\u2019\u00e0 2,5\u00a0m\u00e8tres de hauteur.\n\nDes mod\u00e8les logistiques et financiers de pointe ont permis d\u2019optimiser l\u2019efficacit\u00e9 tout au long du cycle de vie \u00e0 chaque \u00e9tape de la cha\u00eene d\u2019approvisionnement. L\u2019\u00e9quipe a rigoureusement test\u00e9 et valid\u00e9 ces mod\u00e8les et les a utilis\u00e9s pour formuler des recommandations afin de r\u00e9aliser des \u00e9conomies potentielles sur les parcs \u00e9oliens \u00e0 venir.\n\nLes solutions innovantes de LEANWIND devraient aider \u00e0 r\u00e9pondre aux besoins cl\u00e9s de l\u2019industrie et soutenir le succ\u00e8s et la r\u00e9duction des co\u00fbts continus, particuli\u00e8rement pour les sites plus extr\u00eames \u00e0 venir. Cela permettra de garantir la comp\u00e9titivit\u00e9 de l\u2019\u00e9nergie \u00e9olienne offshore et d\u2019assurer le leadership de l\u2019UE dans le secteur des \u00e9nergies renouvelables.\u003C\/sectionBody\u003E\u003C\/section\u003E","keywords":"LEANWIND, \u00e9olien offshore, cha\u00eene d\u2019approvisionnement, exploitation et maintenance, r\u00e9duction des co\u00fbts, principes du Lean","contentCreationDate":"2018-04-18 12:25:59","contentUpdateDate":"2018-04-18 12:25:49","lastUpdateDate":"2024-12-05 14:35:32","archivedDate":"2024-06-10 00:00:00","relations":{"categories":[{"language":"fr","availableLanguages":"de,en,es,fr,it,pl","code":"ener","title":"\u00c9nergie","displayCode":"\/\u00c9nergie","attributes":{"classification":"applicationDomain","type":"isApplicableIn"}},{"language":"fr","availableLanguages":"de,en,es,fr,it,pl","code":"brief","title":"R\u00e9sultat en bref","description":"Article: classique et am\u00e9lior\u00e9","displayCode":"\/R\u00e9sultat en bref","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"fr","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"\u00c9ditorial CORDIS","description":"R\u00e9dig\u00e9 par CORDIS","displayCode":"\/\u00c9ditorial CORDIS","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"430428","id":"430428-overcoming-rough-seas-hurdle-in-offshore-wind-farm-maintenance","title":"Surmonter l\u2019obstacle des mers agit\u00e9es dans la maintenance des parcs \u00e9oliens en mer","teaser":"Comment travailler sur des \u00e9oliennes en mer par mauvais temps? Selon des chercheurs, la combinaison de logiciels intelligents et de la maintenance robotique peut augmenter de 35\u00a0% le temps de travail des navires intervenant dans les parcs \u00e9oliens.","contentUpdateDate":"2021-07-12 13:04:01","archivedDate":"2024-04-19 00:00:00","relations":{"categories":[{"language":"fr","code":"ict","title":"\u00c9conomie num\u00e9rique","displayCode":"\/\u00c9conomie num\u00e9rique","attributes":{"classification":"applicationDomain","type":"isApplicableIn"}},{"language":"fr","code":"ener","title":"\u00c9nergie","displayCode":"\/\u00c9nergie","attributes":{"classification":"applicationDomain","type":"isApplicableIn"}},{"language":"fr","code":"news","title":"Actualit\u00e9s","description":"Article: actualit\u00e9s","displayCode":"\/Actualit\u00e9s","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"fr","code":"scientificAdvances","title":"Progr\u00e8s scientifiques","displayCode":"\/Progr\u00e8s scientifiques","attributes":{"classification":"nature","type":"groupedBy"}},{"language":"fr","code":"editorial","title":"\u00c9ditorial CORDIS","description":"R\u00e9dig\u00e9 par CORDIS","displayCode":"\/\u00c9ditorial CORDIS","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"rcn":"226504","id":"871571","acronym":"ATLANTIS","relations":{"categories":[{"language":"fr","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Projet","description":"Fiches d\u0027information du projet","displayCode":"\/Projet","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"fr","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/67\/425\/1169\/1695","title":"\u00e9nergie \u00e9olienne","displayCode":"\/ing\u00e9nierie et technologie\/g\u00e9nie de l\u0027environnement\/\u00e9nergie et combustibles\/\u00e9nergie renouvelable\/\u00e9nergie \u00e9olienne","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"fr","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/73\/453\/459","title":"robotique","displayCode":"\/ing\u00e9nierie et technologie\/g\u00e9nie \u00e9lectrique, g\u00e9nie \u00e9lectronique, g\u00e9nie de l\u2019information\/ing\u00e9nierie \u00e9lectronique\/robotique","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"fr","availableLanguages":"en","code":"IA","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"fr","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"Centrale de donn\u00e9es de la recherche RTD","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"project","attributes":{"source":"editorial","type":"relatedProject"}},{"language":"fr","availableLanguages":"de,en,es,fr,it,pl,any","uri":"\/docs\/news\/images\/2021-07\/430428.jpg","mimetype":"image\/jpeg","size":"386459","copyright":"\u00a9 m.mphoto, Shutterstock","contenttype":"webItem","attributes":{"represents":"article","source":"editorial","type":"relatedImage"}}]},"contenttype":"article","attributes":{"source":"editorial","type":"relatedArticle"}},{"availableLanguages":"en","rcn":"111310","id":"614020","acronym":"LEANWIND","archivedDate":"2024-06-18 00:00:00","relations":{"categories":[{"language":"fr","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Projet","description":"Fiches d\u0027information du projet","displayCode":"\/Projet","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"fr","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/67\/425\/1169\/1695","title":"\u00e9nergie \u00e9olienne","displayCode":"\/ing\u00e9nierie et technologie\/g\u00e9nie de l\u0027environnement\/\u00e9nergie et combustibles\/\u00e9nergie renouvelable\/\u00e9nergie \u00e9olienne","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"fr","availableLanguages":"en","code":"CP","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"fr","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"Centrale de donn\u00e9es de la recherche RTD","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"857","code":"FP7-TRANSPORT","frameworkProgramme":"FP7","pga":"FP7-TRANSPORT","title":"Programme sp\u00e9cifique \u0022Coop\u00e9ration\u0022: Transports (y compris l\u2019a\u00e9ronautique)","shortTitle":"Transports (y compris l\u2019a\u00e9ronautique)","parent":{"rcn":"846\/1401\/837","code":"FP7-COOPERATION\/EC\/FP7"},"archivedDate":"2024-06-12 00:00:00","relations":{"categories":[{"language":"fr","code":"legalbasis","title":"Base juridique","description":"Programme: Base juridique pour le financement de la recherche","displayCode":"\/Base juridique","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"fr","code":"editorial","title":"\u00c9ditorial CORDIS","description":"R\u00e9dig\u00e9 par CORDIS","displayCode":"\/\u00c9ditorial CORDIS","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis"}},{"availableLanguages":"en","rcn":"18516","code":"OCEAN 2013.4","frameworkProgramme":"FP7","parent":{"rcn":"16228\/16100\/13451\/857\/846\/1401\/837","code":"SST.8\/SST\/TPT\/FP7-TRANSPORT\/FP7-COOPERATION\/EC\/FP7"},"archivedDate":"2024-06-14 00:00:00","relations":{"categories":[{"language":"fr","code":"topic","title":"Th\u00e8me","description":"Programme: Partie du programme de travail de la Commission mettant en \u0153uvre la base juridique","displayCode":"\/Th\u00e8me","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"fr","code":"editorial","title":"\u00c9ditorial CORDIS","description":"R\u00e9dig\u00e9 par CORDIS","displayCode":"\/\u00c9ditorial CORDIS","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedTopic"}}]},"contenttype":"project","attributes":{"source":"editorial","type":"relatedProject"}},{"language":"fr","availableLanguages":"de,en,es,fr,it,pl,any","uri":"\/docs\/results\/images\/2018-04\/224911.jpg","mimetype":"image\/jpeg","size":"0","copyright":"\u00a9 LEANWIND","contenttype":"webItem","attributes":{"represents":"article","source":"editorial","type":"relatedImage"}}],"regions":[{"name":"Irlande","rcn":"305826344","nutsCode":"IE","euCode":"IE","isoCode":"IE","attributes":{"source":"editorial","type":"relatedRegion"}}]},"modelVersion":"132","icaVersion":"20.0.0-48f81e07"}