Objective The installation of a tubular turbine/generating unit in a water supply aqueduct. The anticipated annual energy output is 4,170,000 KWh and the unit cost of energy production is 3. 32 Drs/KWh.The installation of a small hydroelectric generating unit in the Mornos - Athens aqueduct is expected to take advantage of the relatively constant water flow therein. The design parameters of the unit are as follows;Turbine Head 8. 0 mFlow 7. 3 m3/sOutput 600 kWSpeed 400 rev/minType TubularGenerator Rating 700 kVAVoltage 400 V, 50 Hz, 3 phase.Type AsynchronousThe electricity produced will be connected to the grid at 20 kV. Programme(s) ENG-ENALT 2C - Programme (EEC) of demonstration projects relating to the exploitation of alternative energy sources and to energy saving and the substitution of hydrocarbons, 1983-1985 Topic(s) Data not available Call for proposal Data not available Funding Scheme DEM - Demonstration contracts Coordinator PUBLIC POWER CORPORATION (PPC) EU contribution No data Address HEP DEV. DEPT 56-58 AGISIALOU STR. 10436 Athens Greece See on map Total cost No data