Development of postcombustion CO2 capture with CaO in a large testing facility: “CaOling”

Objective

This project is aiming at the scaling-up of one of the most promising concepts for CO2 capture from coal power plants: postcombustion carbonate looping systems. This project focuses on the experimental pilot testing and scaling up of the process at scales in the 1 MW range. The 1 Mw carbonate looping pilot will be built in the Hunosa 50 Mwe CFB coal power plant of “La Pereda”, using a side stream of flue gases of the commercial plant. A parallel research program will be developed along the activities to design, build and test at the pilot, including research activities at lab-scale and fundamental knowledge on sorbent properties. This program will be developed by the scientific leaders in the development of this technology worldwide, and will help with the design of the pilot to a better understand of the results. The scope of this project is the necessary step towards a possible pre-industrial demo plant (10s of Mw scale) .This is clearly in line with the expected level of development for this technology outlined in the European Technology Platform for Zero Emission Fossil Fuel Power Plants and also with wider targets to accelerate the development of breaktrough technologies for CO2 capture under the EU Strategic Enegy Technology Plan.

Call for proposal

FP7-ENERGY-2009-1
See other projects for this call

Coordinator

ENDESA GENERACION SA
EU contribution
€ 813 707,00
Address
AV DE LA BORBOLLA 5
41004 Sevilla
Spain

See on map

Region
Sur Andalucía Sevilla
Activity type
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Administrative Contact
Andrés Sanchez-Biezma Sacristan (Mr.)
Links
Total cost
No data

Participants (7)