Development of a shaft furnace pilot plant (1st phase)

Objetivo

The aim of the project is to develop and operate, on an industrial scale, a new-design electric arc furnace with an attached shaft for continuous scrap loading and scrap preheating. The hot waste gases from the furnace will be sucked through the scrap column of the pre-heater shaft where they will be cooled down. The dust contained in the waste gases will be partially trapped by the scrap column. The material to be melted will continuously flow from the shaft into the furnace hearth. The main aim is to assess the feasibility of reducing energy consumption, shortening melting-time, reducing electrode consumption and noise level as well as of using wet and contaminated scrap.

Convocatoria de propuestas

Data not available

Régimen de financiación

DEM - Demonstration contracts

Coordinador

DET DANSKE STÅLVALSEVÆRK
Aportación de la UE
Sin datos
Dirección

3300 FREDERIKSVÆRK
Dinamarca

Ver en el mapa

Coste total
Sin datos

Participantes (1)