Skip to main content
European Commission logo print header
Contenu archivé le 2022-11-21

New strategies for clogging prevention for improved productivity and steel quality

Objectif

Clogging is still a problem to solve. To achieve a break through in this project a new basic knowledge will be elaborated as a basis for the development of new strategies for clogging prevention like new feeding system designs in conjunction with innovative gas injection, prediction and control of clogging.

This will be done in an integrated approach concerning chemical and physical phenomena in conjunction with an extensive operational database using advanced or newly developed investigation and measurement methods.

The obtained results will be verified by operational data and trials with a view to a final implementation of the new strategies in the operational praxis.

Thème(s)

Data not available

Appel à propositions

Data not available

Régime de financement

Data not available

Coordinateur

BETRIEBSFORSCHUNGSINSTITUT VDEH-INSTITUT FUR ANGEWANDTE FORSCHUNG GMBH
Contribution de l’UE
Aucune donnée
Adresse
Sohnstrasse 65
40237 DUSSELDORF
Allemagne

Voir sur la carte

Liens
Coût total
Aucune donnée

Participants (7)