WP1. Management and Technical coordination (T0: T0+36)
Close out of PDR milestone
Close out of CDR milestone
Preparation of TRR milestone
No risks are raised. Evolving situation about COVID-19 pandemic suggests at this stage there will no be impact on campaigns execution. Activities are on going as planned (See dedicated WPs).
WP2 User Requirements, ConOps and Regulation (T0: T0+10)
Activity completed
WP3 PASSport solution design and MAIT T0+6 T0+20
Activity on going.
First prototype ready for EMD event (20th of May) in Ravenna, where a DEMO has been presented
WP4 Validation Campaigns T0+18 T0+34
Activity on going
• C1. Kolobrzeg [MUS] 2022/09
Campaign preparation: starting from 2022 Q1
Campaign dissemination: all 2022
Campaign execution: 2022 Q3 (Sept 2022)
Campaign event organisation 2022-Q3
Campaign report: 2022 Q4
• C2 Ravenna [APRA] 2023/04-05
Campaign preparation: starting from 2022 Q3
Campaign dissemination: starting from 2022- Q4
Campaign execution: 2023 Q2 (April/May 2023)
Campaign event organisation 2023-Q2
Campaign report: 2023 Q3
• C3 Le Havre (HAROPA) [CRM] 2023/06
Campaign preparation: starting from 2022 Q3
Campaign dissemination: starting from 2022- Q4
Campaign execution: 2023 Q2 (June 2023)
Campaign event organisation 2023-Q2
Campaign report: 2023 Q3
• C4 Hamburg [BM] 2023/07
Campaign preparation: starting from 2023 Q1
Campaign dissemination: all 2023
Campaign execution: 2023 Q3 (Sept 2023)
Campaign event organisation 2023-Q3
Campaign report: 2023 Q4
For Info. Synergies have been identified with H2020 rapid (
https://rapid2020.eu/(s’ouvre dans une nouvelle fenêtre)) project performing campaign in Hamburg port area. A possibility for an integrated campaign is being discussed.
• C5 Valencia [FVP] 2023/09
Campaign preparation: starting from 2023-Q1
Campaign dissemination: starting from 2023-Q1
Campaign execution: 2023 Q2 (September 2023)
Campaign event organisation 2023-Q3
Campaign report: 2023 Q4
WP5 Dissemination for awareness and exploitation T0 T0+36
Two articles are being prepared:
GEOmedia magazine presenting a PASSport concept;
a paper (IEEE Journal of Oceanic Engineering) in collaboration with Italian Navy force based on activities planned to be performed in La Spezia port area).
Dissemination in the radar (2022 Q2, Q3)
• 11eme assises du port du future, Sept 2021=> DONE
https://www.portdufutur.fr/les-assises(s’ouvre dans une nouvelle fenêtre)https://www.youtube.com/watch?v=7_OrTIaLm3I(s’ouvre dans une nouvelle fenêtre)• Korean Maritime week, Nov 2021=> DONE
http://maritimeweekeng.co.kr/(s’ouvre dans une nouvelle fenêtre)• ECOFIRA, Valencia, Sept 2021=> DONE
http://ecofira.feriavalencia.com/(s’ouvre dans une nouvelle fenêtre)• Marissa days 5 (
http://marissa-days.org/Marissa-Days/event/encyhnMrGLEHdU-3D-/;jsessionid=af31b44dfc05e1c6b9214dc95900(s’ouvre dans une nouvelle fenêtre)) January 13th 2022 => DONE
• European Maritime days (ref. Website) 20th of May 2022
• The PASSport project has been officially accepted as an candidate for the IAPH Sustainability Award in the category “Digitalization”. IAPH has launched a press release on this topic:
https://bit.ly/3LZAtTW(s’ouvre dans une nouvelle fenêtre)• IHMA 2022 => 26-29 June 2022
https://globalportoperations.com/agenda/#1651728260367-f88328ce-56b8(s’ouvre dans une nouvelle fenêtre)• MARISSA conference Bremerhaven Mid 2022?
https://www.seatechweek.eu/news-750-200-0-0.html(s’ouvre dans une nouvelle fenêtre) planned 26-30 Sept 2022 in Brest
WP6 Economic viability and Solution roadmap T0 T0+36
Activity on going
D6.1 delivered at TRR
WP7 Ethics Requirements T0 T0+22
All document delivered. See deliverables’ section