CORDIS provides links to public deliverables and publications of HORIZON projects.
Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .
Deliverables
Produced as a result of T2.4. Description: A prototype of integrated monitoring systems for the detection of contaminants in urban runoff composed of the sample preparation module, the detection module, the electromechanical components, the electronic control board and the firmware for data analysis/representation
Intermediate progress report on the actions carried on in the case studies (opens in new window)Produced as result of T6.2 and T6.3. Description: A report for dissemination to stakeholders and process tracking including the relevant information regarding the case studies between M18 and M29, including its contribution to the technical developments done in WP1 to WP4 (including a summary of the developed/adapted technologies) preparation and launch of the testing actions in WP5, local event/ open days (T6.3) and also the main dissemination and communication actions.
Monitoring system module for water sample preparation (opens in new window)Produced as a result of T2.2. Description: A prototype of the monitoring system module will be developed. It will prepare the water samples previous to the measurement in the sensors. It will perform preconcentration and sample clean-up, through the clean-up and pre-concentration modules.
Initial progress report on the actions carried on in the case studies (opens in new window)Produced as result of T6.2 and T6.3. Description: A report for dissemination to stakeholders and process tracking including the relevant information regarding the case studies, including its contribution to the technical developments done in WP1 to WP4 (v), co-design sessions done in WP4 for the specification of the AI-Platform, stakeholder engagement actions (open days in pilots) and also the main dissemination and communication actions.
Report on monitoring system detection module for the detection of contaminants (opens in new window)Produced as a result of T2.3. Description: Report including a public summary of the characteristics of the detection module and actions done, excluding sensitive information.
Produced as a result of T.6.1. Description Development of the communication materials of the project including; i) Communication material package and visual identity 1) Project brand and visual identity, including project flyer and rollup; 2) Website and Social media accounts created
Graph or flowchart that attempts to account for all the risk exposure a project faces as it unfolds.
Communication & dissemination strategy (opens in new window)Produced as a result of T6.1. Description: Report including the strategy of communication and dissemination for the whole project, including target audiences, key messages and channels
Preliminary versions of suspect screening and non target screening (NTS) methods analysis (opens in new window)Produced as a result of T1.1, including ST1.1.1 and ST1.1.2. Description: A report including a draft of the standard operating protocol (SOP) for LC-MS based suspect screening and NTS analysis. The SOP will include a flow diagram and description of each of the steps The development of this deliverable will include collection of water samples in the 3 case studies (ST1.1.2).
Initial policy brief to address diffuse pollution from runoff in urban areas (opens in new window)Produced as result of D6.5. ST6.5.1; Description: A report including; i) relevant information collected in the first part of the project regarding EU policies related with the project scope, namely, the Water Framework Directive, the Marine Strategy Framework Directive, the REACH Regulation or the Action Plan “Digital Single Market for Water Services”, among others; ii) conclusions, recommendations and orientation of further actions to be done along the project and by other stakeholders.
Standard Operating Protocols (SOP) for suspect screening and non target screening (NTS) analysis workflows for stormwater (opens in new window)Produced as a result of T1.1 and T.1.2, including ST1.1.1, ST1.1.2, ST1.2.1, ST1.2.2, and ST.1.2.4. Description: A report containing the final SOP for suspect screening and NTS analysis with one illustrative example of each steps using the preliminary stormwater data set.The development of this deliverable will include collection of water samples in the 3 case studies (ST1.1.2).
Second intermediate update of the communication and dissemination strategy and reporting on actions done in the second project period (opens in new window)Produced as a result of the partial action done in T6.1 between M18 to M30. Description: Update of the strategy for communication & dissemination, including a summary activity report of the actions done between M18 to M29
Library of pollutants from urban runoff in Nature Based Solutions (opens in new window)Produced as a result of T1.3, including ST1.3.1, ST1.3.2 and ST1.3.3. Description: Report including a draft inventory (e.g. a database) with identified pollutants in stormwater. The inventory will contain quantitative or semi-quantitative data of the identified pollutants from the initial screening of stormwater in WP1, analytical information, and the origin of pollutants. The analytical data will, when possible, be supplemented with publicly available data on psychochemical properties. The inventory will be published as a scientific article where the data will be discussed in relation to previous findings. The development of this deliverable will include collection of water samples in the 3 case studies (ST1.3.1)
Requirements and specifications of online monitoring systems for sensors (opens in new window)Produced as a result of T2.1. Description: Report containing the main requirements and specifications for the sensors’ operation in the different case studies. Requirements in terms of water quality parameters, energy supply, measurement frequency, etc will be collected to be taken into account in the monitoring systems design. The development of this deliverable will use direct information on requirements collected from the entities working in the 3 case studies
Multi-criteria decision analysis (MCDA) for selection and location of hybrid solutions (opens in new window)Produced as a result of T3.3. Description: Report on mathematical methodology for customizing hybrid solutions based on the selected criteria and requirements.
Initial preparatory and testing report in case studies (opens in new window)Produced as result of the first set of actions implemented within T5.1, T5.2, T5.3, T.5.4, T.5.5. Description: A report including; i) a summary of the information and data obtained from the preparatory and ongoing testing activities implemented in T5.1 (involving detection methods developed in WP1), T5.2 (involving the risk assessment & risk mapping methodology developed in WP4), T5.3 (involving the online sensors developed in WP2), T.5.4 (involving the AI-Platform developed in WP4), T.5.5 (involving the MCDA developed in WP3); ii) feedback to WP1to WP4; iii) action plan for the further testing actions to be done.
Initial preparatory report on the assessment of the replicability. (opens in new window)Produced as result of T5.6, ST5.6.2. Description: A report including the main actions to be implemented with the cooperation of the replication sites for the assessment of the replicability, procedures, tools and action plan.
Report on co-design of the AI-Assisted Platform with stakeholders' community (opens in new window)Produced as a result of T4.1. Description: A report containing the paper prototypes drafted in each co-design session with the pilots. The development of this deliverable will be done with the participation of end-users in the 3 case studies
Ranking of pollutants on their risk of accumulation (opens in new window)Produced as a result of T1.4, including ST1.4.1, ST1.4.2 and ST1.4.3 and ST1.4.4. Description; Report including a ranking of priority pollutants on the risk of accumulation in the soil matrix and the risk of break-through to the groundwater, encompassing 5 NBS and 5 contaminant classes. The development of this deliverable will include the collection of soil/sediment (ST1.4.1) and investigation of the filtration efficiency of case studies’ NBS (ST1.4.3) at the 3 case studies
Parametric library of Nature Based Solutions (NBS) (opens in new window)Produced as a result of T3.1 and T3.2. Description: Report on a complete categorised inventory of the whole urban drainage techniques designed according to parametric principles. For experts consulting and as a baseline document for the hybrid customized solutionThe practical experience with the implementation of different NBS in the 3 case studies will be used as one of the information sources for the critical review.
Standard operating protocols (SOP) for identification in non target sceening (NTS) methods and quantification in suspect screening (opens in new window)Produced as a result of T1.1 and T1.2, including ST1.1.3, ST1.2.1, ST1.2.2, ST1.2.3, and ST1.2.4. A report on the SOP for the identification workflow describing confidence levels for identification (Level 1-4); and a draft of a scientific article that describes the semi-quantification workflow for LC-MS and/or GCxGC-HRMS suspect screening and NTS The development of this deliverable will include collection of water samples in the 3 case studies.
Public summary of the Geographical information system (GIS) location tool for Nature Based Solutions (NBS) hybrid solutions at city scale (opens in new window)Produced as a result of T3.4. Description: Report including a public summary of the characteristics of the GIS location tool for NBS hybrid solutions at city scale, and actions done, excluding sensitive information.
Initial report on clustering activities (opens in new window)Produced as result of D6.5, ST6.5.2. Description: A report summarizing the main clustering activities implemented in the first period of the project and including an action plan for improving the effectiveness of further clustering activities.
Intermediate update of the communication and dissemination strategy and reporting on actions done in the first project period (opens in new window)Produced as a result of the partial action done in T6.1 up to M18. Description: Update of the strategy for communication & dissemination, including an summary activity report of the actions done in the first 18 months
Produced as a result of T7.3. Description: Plan for outlining how data will be generated, collected, stored, handled, shared, and maintained
Interim Data Management Plan (opens in new window)Produced as a result of T7.3.Description: Report on how data is being generated, collected, stored, handled, shared, and maintained along the project
Publications
Author(s):
Andrés Valeri, Valerio Carlos Alessio; García Argüelles, Sara; Sañudo Fontaneda, Luis Ángel; Rodríguez Gallego, José Luis; Rodríguez Hernández, Jorge; Sierra, Carlos
Published in:
NOVATECH 2023, 2023
Publisher:
https://www.novatech2023.org/en/
Author(s):
Uffe Linneberg Gangelhof
Published in:
Innovation News Network, Issue 18, 2024
Publisher:
Pan European Networks Ltd
DOI:
10.5281/zenodo.11368226
Author(s):
Selina Tisler, Kristoffer Kilpinen, David I. Pattison, Giorgio Tomasi, and Jan H. Christensen
Published in:
Analytical Chemistry, Issue 96, 1, 2024, ISSN 0003-2700
Publisher:
ACS Publications
DOI:
10.1021/acs.analchem.3c03791
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available