Obiettivo The economic evaluation of the replacement of an outdated ironworks with new coal-based direct reduction ironmaking technology has been completed in a preceding contract (7215.BA/601). The technical work has shown that the basic physical and chemical principles of the CCF process are sound and that all the engineering aspects can be solved. However, the proposed current phase of the project aims to further experiment the longevity and metallurgical efficiency of the cyclone as well as the conditions of linked smelting-reduction operation and scaling-up. This project will be coordinated at the European level as well as with project PP 189. Programma(i) ECSC-STEELDEM 3C - Medium-term guidelines (ECSC) for the programmes of technical steel research and of steel pilot/demonstration projects, 1991-1995 Argomento(i) T1 - Iron and steelmaking Invito a presentare proposte Data not available Meccanismo di finanziamento Data not available Coordinatore MATERIALS RESEARCH CENTRE Contributo UE Nessun dato Indirizzo Via di Castel Romano 100/102 00128 ROMA Italia Mostra sulla mappa Costo totale Nessun dato