Skip to main content
European Commission logo print header
Contenu archivé le 2022-11-21

Improvements in communication and hearing conservation in steelworks

Objectif

Aims of the project:

Improving auditory communications within steelworks with particular reference to developing guidelines for the selection of auditory signal sets for use in areas of high noise.

Methods:

Theoretical and laboratory based comparisons of two methods for predicting signal audibility.
On site comparison of the two methods with direct measurements of signal audibilities using steelworks operatives and typical steelworks noise.
Identification of problems associated with existing signal sets.
Development of guidelines for the selection of auditory signals.

Thème(s)

Data not available

Appel à propositions

Data not available

Régime de financement

Data not available

Coordinateur

British Steel plc
Contribution de l’UE
Aucune donnée
Adresse
Moorgate
S60 3AR Rotherham
Royaume-Uni

Voir sur la carte

Coût total
Aucune donnée