Skip to main content
Ir a la página de inicio de la Comisión Europea (se abrirá en una nueva ventana)
español español
CORDIS - Resultados de investigaciones de la UE
CORDIS

TEchnology TRAnsfer via Multinational Application eXperiments

CORDIS proporciona enlaces a los documentos públicos y las publicaciones de los proyectos de los programas marco HORIZONTE.

Los enlaces a los documentos y las publicaciones de los proyectos del Séptimo Programa Marco, así como los enlaces a algunos tipos de resultados específicos, como conjuntos de datos y «software», se obtienen dinámicamente de OpenAIRE .

Resultado final

Individual publishable TTX results abstract and exploitation/business plan (for TTX 54) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Periodic Project Report 3 and final report (se abrirá en una nueva ventana)

Annual project reports will be delivered including a detailed description of all anagement activities and potential corrective actions needed D74 will include the final project report

UZAGREB individual publishable TTX results abstract and exploitation/business plan (se abrirá en una nueva ventana)

One month after TTX completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible businessopportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 42) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 27) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 24) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

JSI individual publishable TTX results abstract and exploitation/business plan (se abrirá en una nueva ventana)

One month after TTX completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible businessopportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 37) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 26) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 2) (se abrirá en una nueva ventana)

Delivery Date due (in months): 1 month after TTX completion One month after completion, each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities.

UEDIN individual publishable TTX results abstract and exploitation/business plan (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completion each TTX has to deliveran abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 34) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 9) (se abrirá en una nueva ventana)

Delivery date due (in months): 1 month after TTX completion One month after completion, each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities.

Individual publishable TTX results abstract and exploitation/business plan (for TTX 33) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

PISA individual publishable TTX results abstract and exploitation/business plan (se abrirá en una nueva ventana)

One month after TTX completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible businessopportunities

Impact report 2 (se abrirá en una nueva ventana)

Deliverable is the annual report on TETRAMAX impact at all levels (entire CCN, each CC, each TTX), comprising quantifiable impact indicators as well as analyses and learnings.

Individual publishable TTX results abstract and exploitation/business plan (for TTX 39) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Annual dissemination and communication report 3 (se abrirá en una nueva ventana)

All dissemination and communication activities and results will be summarized within the annual report

Individual publishable TTX results abstract and exploitation/business plan (for TTX 59) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Annual CCN activities report 1 (se abrirá en una nueva ventana)

The activities and results of Tasks T1.1 – T1.9 will be described in annual reports.

INRIA Individual publishable TTX results abstract and exploitation/business plan (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completion each TTX has to deliveran abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 46) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 7) (se abrirá en una nueva ventana)

Delivery date due (in months): 1 month after TTX completion One month after completion, each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities.

Initial collaboration plan (se abrirá en una nueva ventana)

Description of all collaboration activities within SAE and DIH initiatives

Annual CCN activities report 2 (se abrirá en una nueva ventana)

The activities and results of Tasks T1.1 – T1.9 will be described in annual reports.

Individual publishable TTX results abstract and exploitation/business plan (for TTX 13) (se abrirá en una nueva ventana)

Delivery date due (in months): 1 month after TTX completion One month after completion, each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities.

Individual publishable TTX results abstract and exploitation/business plan (for TTX 18) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 25) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Impact report 3 (se abrirá en una nueva ventana)

Deliverable is the annual report on TETRAMAX impact at all levels entire CCN each CC each TTX comprising quantifiable impact indicators as well as analyses and learnings

Individual publishable TTX results abstract and exploitation/business plan (for TTX 38) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 51) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

TUT individual publishable TTX results abstract and exploitation/business plan (se abrirá en una nueva ventana)

One month after TTX completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible businessopportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 4) (se abrirá en una nueva ventana)

Delivery date due (in months): 1 month after TTX completion One month after completion, each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities.

Individual publishable TTX results abstract and exploitation/business plan (for TTX 6) (se abrirá en una nueva ventana)

Delivery date due (in months): 1 month after TTX completion One month after completion, each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities.

Individual publishable TTX results abstract and exploitation/business plan (for TTX 10) (se abrirá en una nueva ventana)

Delivery date due (in months): 1 month after TTX completion One month after completion, each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities.

UPC individual publishable TTX results abstract and exploitation/business plan (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completion each TTX has to deliveran abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Impact report 1 (se abrirá en una nueva ventana)

Deliverable is the annual report on TETRAMAX impact at all levels (entire CCN, each CC, each TTX), comprising quantifiable impact indicators as well as analyses and learnings.

Individual publishable TTX results abstract and exploitation/business plan (for TTX 20) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 57) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 50) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

THINKS individual publishable TTX results abstract and exploitation/business plan (se abrirá en una nueva ventana)

One month after TTX completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible businessopportunities

EU-wide CC business plan (se abrirá en una nueva ventana)

D623 will be delivered based on the individual business plans Note that the business plans and exploitation strategies of the individual TTX are contained in WP3 D31 D3n

Individual publishable TTX results abstract and exploitation/business plan (for TTX 28) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 36) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 58) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 30) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

UGENT Individual publishable TTX results abstract and exploitation/business plan (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completion each TTX has to deliveran abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 52) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 41) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 22) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Annual CCN activities report 3 (se abrirá en una nueva ventana)

The activities and results of Tasks T11 T19 will be described in annual reports

RWTH individual publishable TTX results abstract and exploitation/business plan (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Annual dissemination and communication report 4 (se abrirá en una nueva ventana)

All dissemination and communication activities and results will be summarized within the annual report

Individual publishable TTX results abstract and exploitation/business plan (for TTX 29) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 55) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 47) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 19) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 44) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

TECHMO individual publishable TTX results abstract and exploitation/business plan (se abrirá en una nueva ventana)

One month after TTX completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible businessopportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 49) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Annual CCN activities report 4 (se abrirá en una nueva ventana)

The activities and results of Tasks T11 T19 will be described in annual reports

BME individual publishable TTX results abstract and exploitation/business plan (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completion each TTX has to deliveran abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 12) (se abrirá en una nueva ventana)

Delivery date due (in months): 1 month after TTX completion One month after completion, each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities.

AMGT individual publishable TTX results abstract and exploitation/business plan (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completion each TTX has to deliveran abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 5) (se abrirá en una nueva ventana)

Delivery date due (in months): 1 month after TTX completion One month after completion, each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities.

Individual publishable TTX results abstract and exploitation/business plan (for TTX 56) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 48) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Impact report 4 (se abrirá en una nueva ventana)

Deliverable is the annual report on TETRAMAX impact at all levels entire CCN each CC each TTX comprising quantifiable impact indicators as well as analyses and learnings

Individual publishable TTX results abstract and exploitation/business plan (for TTX 32) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 11) (se abrirá en una nueva ventana)

Delivery date due (in months): 1 month after TTX completion One month after completion, each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities.

Individual publishable TTX results abstract and exploitation/business plan (for TTX 21) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 3) (se abrirá en una nueva ventana)

Delivery date due (in months): 1 month after TTX completion One month after completion, each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities.

Individual publishable TTX results abstract and exploitation/business plan (for TTX 40) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 45) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

TTU individual publishable TTX results abstract and exploitation/business plan (se abrirá en una nueva ventana)

One month after TTX completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible businessopportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 15) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 17) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

CDS individual publishable TTX results abstract and exploitation/business plan (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

BUT individual publishable TTX results abstract and exploitation/business plan (se abrirá en una nueva ventana)

One month after TTX completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible businessopportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 35) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

IT4I individual publishable TTX results abstract and exploitation/business plan (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completion each TTX has to deliveran abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 14) (se abrirá en una nueva ventana)

Delivery date due (in months): 1 month after TTX completion One month after completion, each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities.

Individual publishable TTX results abstract and exploitation/business plan (for TTX 53) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 16) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 60) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 8) (se abrirá en una nueva ventana)

Delivery date due (in months): 1 month after TTX completion One month after completion, each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities.

TETRAMAX White Paper (se abrirá en una nueva ventana)

D74 will summarize the major TETRAMAX results and learnings for future projects and initiatives

Individual publishable TTX results abstract and exploitation/business plan (for TTX 31) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Individual publishable TTX results abstract and exploitation/business plan (for TTX 1) (se abrirá en una nueva ventana)

Delivery date due (in months): 1 month after TTX completion One month after completion, each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities.

Individual publishable TTX results abstract and exploitation/business plan (for TTX 43) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Annual dissemination and communication report 1 (se abrirá en una nueva ventana)

All dissemination and communication activities and results will be summarized within the annual report.

Individual publishable TTX results abstract and exploitation/business plan (for TTX 23) (se abrirá en una nueva ventana)

Delivery date due in months 1 month after TTX completionOne month after completion each TTX has to deliver an abstract with its contents and major results as well as a short plan for further exploitation and possible business opportunities

Annual dissemination and communication report 2 (se abrirá en una nueva ventana)

All dissemination and communication activities and results will be summarized within the annual report.

Publicaciones

Performance Evaluation of the UWB-based CDS Indoor Positioning Solution (se abrirá en una nueva ventana)

Autores: Puschita, E., Simedorin, S., Palade, T., Codau, C., Vos, S., Ratiu, V., Ratiu, O.
Publicado en: IEEEXplore, 2020
Editor: 2020 International Workshop on Antenna Technology (iWAT)
DOI: 10.1109/iwat48004.2020.1570609927

Run-to-Completion versus Pipelined: The Case of 100 Gbps Packet Parsing (se abrirá en una nueva ventana)

Autores: Hesam Zolfaghari, Haseeb Mustafa, Jari Nurmi
Publicado en: 2021 IEEE 22nd International Conference on High Performance Switching and Routing, HPSR 2021, 2021, ISBN 9781665440059
Editor: IEEE
DOI: 10.1109/hpsr52026.2021.9481797

Highly parallel GPU accelerator for HEVC transform and quantization (se abrirá en una nueva ventana)

Autores: Mate Cobrnic; Alen Duspara; Leon Dragić; Igor Piljić; Mario Kovač
Publicado en: Proc. SPIE 11584, 2020 International Conference on Image, Video Processing and Artificial Intelligence, Edición 5, 2020
Editor: SPIE
DOI: 10.1117/12.2581228

Piezoresistive Cantilevers’ Platform for Bio-Chemical Sensing (se abrirá en una nueva ventana)

Autores: V. Stavrov, G. Stavreva, E. Tomerov, M. Villani, S. Kotsev, K. Kostadinov
Publicado en: Proc. IEEE 3M-NANO 2021, 2021, China, 2021
Editor: IEEE
DOI: 10.1109/3m-nano49087.2021.9599795

An Application for Building a Polish Telephone Speech Corpus

Autores: Bartosz Ziółko, Piotr Żelasko, Ireneusz Gawlik, Tomasz Pędzimąż, Tomasz Jadczyk
Publicado en: 2018
Editor: Language Resources and Evaluation Conference

Libra – Bluetooth pocket kitchen scale

Autores: Koroušić-Seljak Barbara, Blažica Bojan, Biasizzo Anton, Papa Gregor, Santo Zarnik Marina
Publicado en: HEALTH OF CHILDREN AND ADOLESCENTS, Book of Abstracts, 3rd scientific and professional international conference, 2019, Página(s) 124-125, ISBN 978-961-7055-73-3
Editor: University of Primorska Press

An FPGA-Based Hardware Accelerator for CNNs Inference on Board Satellites: Benchmarking with Myriad 2-Based Solution for the CloudScout Case Study (se abrirá en una nueva ventana)

Autores: Emilio Rapuano; Gabriele Meoni; Tommaso Pacini; Gianmarco Dinelli; Gianluca Furano; Gianluca Giuffrida; Luca Fanucci
Publicado en: Remote Sensing, 2021, Página(s) 20, ISSN 2072-4292
Editor: Multidisciplinary Digital Publishing Institute (MDPI)
DOI: 10.3390/rs13081518

A Multi-Cache System for On-Chip Memory Optimization in FPGA-Based CNN Accelerators (se abrirá en una nueva ventana)

Autores: Tommaso Pacini, Emilio Rapuano, Gianmarco Dinelli, and Luca Fanucci
Publicado en: Electronics, 2021, Página(s) 18, ISSN 2079-9292
Editor: MDPI
DOI: 10.3390/electronics10202514

Ballerina Flyer: Designing flyer for the presentation of TETRAMAX internal Technology Transfer eXperiment

Autores: Marina Santo Zarnik, Peter Novak, Barbara Koroušić-Seljak, Gregor Papa
Publicado en: 2019
Editor: Jožef Stefan Institute

Secure Low-Power WAN with detection modules

Autores: Vozňák Miroslav; Eglynas Tomas
Publicado en: 2020
Editor: Vozňák Miroslav

Buscando datos de OpenAIRE...

Se ha producido un error en la búsqueda de datos de OpenAIRE

No hay resultados disponibles

Mi folleto 0 0