FURTHER DEVELOPMENT AND OPERATION OF AN AUTOMATED LARGE-SCALE RADIOACTIVITY MEASUREMENT FACILITY FOR LOW-LEVEL DECOMMISSIONING WASTE

Objective

For the application of an existing mobile radioactivity measurement facility (RMF) for the decommissioning of WWER nuclear power plants (former GDR) new measuring and calibration procedures as well as new software, to simplify data evaluation, should be developed.

In extended tests, the success of the RMF modifications will be demonstrated for a relatively large spectrum of radioactive wastes produced during operation or occurring during decommissioning of the 75 MW WWER of Rheinsberg. Investigations and trial measurements should indicate to what extent money could be saved, avoiding waste disposal by means of the RMF (classification of wastes).

NIS Ingenieurgesellschaft will elaborate the facility requirements in cooperation with NIS Rheinsberg and KKW Rheinsberg. The project is a continuation of the research work performed under the previous CEC contract No. FI1D0062.
The nuclear power plant Rheinsberg (KKR) was closed down in 1990. Until that time there did not exist any procedures for the unrestricted release of materials out of the controlled area. The type of KKR wastes and its nuclide composition are different compared to Western light water reactors. For further development of an existing release measurement facility (RMF) different types of materials out of the controlled areas were measured with the RMF. The measuring of KKR in autumn 1992 lasted about 2 months. Afterwards 34% of about 100 Mg measured material in total could be declared as releasable, but some types of wastes could be released up to 90%.

In 1996 the results of the measurements have been discussed with experts and licensing authorities again. Some of the conservative assuptions concerning the nuclide mixtures for the release measurements could be refuted and new clearence levels have been defined, so that nearly 90% of all the material could be released as free.

Since starting in1988, about 2500 mg of different materials have been measured by the RMF within 20 measuring campaigns in Germany. 88% were released for direct use.

The NIS concept of gross gamma measurements for release of materials was represented to experts and licensing authorities in other European countries.
WORK PROGRAMME

1. Definition of the measuring conditions
2. Registration of waste categories and amounts
3. Specification of measuring parameters for calibration purposes
4. Planning of the measuring campaign
5. Development of the software package
6. Execution of the measuring campaign
7. Processing and evaluation of the measuring results
8. Determination of specific data such as: costs, working time, job doses, waste amounts etc.

Fields of science (EuroSciVoc)

CORDIS classifies projects with EuroSciVoc, a multilingual taxonomy of fields of science, through a semi-automatic process based on NLP techniques. See: The European Science Vocabulary.

You need to log in or register to use this function

Programme(s)

Multi-annual funding programmes that define the EU’s priorities for research and innovation.

Topic(s)

Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.

Call for proposal

Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.

Data not available

Funding Scheme

Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.

CSC - Cost-sharing contracts

Coordinator

NIS INGENIEURGESELLSCHAFT MBH
EU contribution
No data
Address
23,Donaustrasse 23
63452 HANAU
Germany

See on map

Total cost

The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.

No data

Participants (2)

My booklet 0 0