Obiettivo Implementation of M&T systems in 5 German industrial sites and publication of the (successful) resultsDuring the project monitoring and targeting (M&T) systems would be established in four or five German pilot plants.The ability of M&T systems to reduce the utility consumption and therefor the utility costs would be demonstrated in this project. By publishing the results and a description how M&T works, further companies should be motivated to implement M&T systems themselves.In the first phase of the project an information campaign will inform German managers about M&T and successful case studies in industrial sites in other countries. Based on this information companies which are interested to participate in the project would be recruited. In preliminary audits, the costs and the potential for savings will be investigated in these companies. Based on this preliminary audits four or five companies would be selected as pilot plants.In phase two the M&T systems would be installed and operated in the pilot plants. The stuff would be trained how to use the system. Regular visits of the consultant team in the pilot plants would ensure an optimum of savings achieved in these plants.We expect that we are able to demonstrate with these pilot plants the possibility to reduce the utility costs of companies significantly by operating an M&T system, with an attractive pay-back period for the investment.Comprehensive information about the success of M&T in these pilot plants would be published in the third phase by articles in journals and lectures at conferences. A wide dissemination of M&T in Germany should be ensured by this. Programma(i) ENG-SAVE 2 - Multiannual programme for the promotion of energy efficiency in the European Union (SAVE II), 1996-2000 Argomento(i) 19 - Industry Invito a presentare proposte Data not available Meccanismo di finanziamento Data not available Coordinatore Martin Theweleit Energieberatung Contributo UE Nessun dato Indirizzo 95,Neusser Strasse 50670 Köln Germania Mostra sulla mappa Costo totale Nessun dato Partecipanti (2) Classifica in ordine alfabetico Classifica per Contributo UE Espandi tutto Riduci tutto March Consulting Group Regno Unito Contributo UE Nessun dato Indirizzo Telegraphic House, Waterfront Quay, Salford Quays M5 2XW Manchester Mostra sulla mappa Costo totale Nessun dato VIK Energieberatung GmbH Germania Contributo UE Nessun dato Indirizzo 41,Richard-Wagner-Strasse 45128 Essen Mostra sulla mappa Costo totale Nessun dato