Resultado final
Project Handbook according to call requirement
Exploitation Plan: first draft (se abrirá en una nueva ventana)Exploitation Plan: first draft. report delivered according to call requirements
Selected reduced/skeletal reaction mechanism of H2/CH4 syngas combustion (se abrirá en una nueva ventana)Selected reduced/skeletal reaction mechanism of H2/CH4 syngas combustion. this activity is prleiminary to combustionb model definitoon and burner design.Skeletal reaction mechanisms for CFD simulations will be identified based on detailed reaction mechanisms to predict the combustion process. For modelling turbulent flames, the mixing time scale (e.g. conventional flame vs. flameless conditions) for the fuel and oxidant is a crucial factor and can affect the results significantly in terms of flame structure, ignition delay, blow-off, temperature etc
Report containing the Key Performance Indicators (se abrirá en una nueva ventana)RINA-CSM will provide to the Consortium, and in particular to the WP leaders, guidelines and instructions to ensure the high-quality of the results, the deliverables and the whole project. Key performance indicators (KPI) document, established at the KoM to evaluate the project results, will be revised on a 6-months basis and will be used to assess the achievements of the project. this report describe the individuated KPi and first applicationl
Communication and Dissemination Plans; final (se abrirá en una nueva ventana)Communication and Dissemination Plans; according to call requirements.The C&D Plan will be released including (i) identification of key stakeholders, (ii) the dissemination methods and channels needed to achieve the expected awareness, acceptance and final uptake; (iii) C&D procedures, in line also with the consortium Grant agreement (GA) and consortium agreement (CA)
D1.1 Operating conditions of the reference industrial furnace 1 SWERIM R PUB 6 (se abrirá en una nueva ventana)In this Deliverable the technical characterirstic of the furnaces involved in the activitikes are described, outling similarities and differences
Communication and Dissemination Plans; mid-term analysis (se abrirá en una nueva ventana)Communication and Dissemination Plans; mid-term analysis. report defined according to call requirements
Communication and Dissemination Plans; first draft (se abrirá en una nueva ventana)Electrolyser installation for the tests at tenova premises
Creation of Website and social media channels to disseminate project results and provide update info about project activites