Advanced Braking Module with Cyclic Energy Recovery System (CERS) for enhanced reliability and performance of Wave Energy Converters

CORDIS proporciona enlaces a los documentos públicos y las publicaciones de los proyectos de los programas marco HORIZONTE.

Los enlaces a los documentos y las publicaciones de los proyectos del Séptimo Programa Marco, así como los enlaces a algunos tipos de resultados específicos, como conjuntos de datos y «software», se obtienen dinámicamente de OpenAIRE .

Resultado final

Techno-economic analysis (se abrirá en una nueva ventana)

Techno-economic analyses (UEDIN; M25). Report with estimate of improvement on the LCOE that the CERS braking module will provide within an existing PTO, including also LCA, SCOE and indicative values of energy per ton, energy per CAPEX and energy per OPEX.

Final recommendations and guidelines (se abrirá en una nueva ventana)

Final recommendations and guidelines - Technical Development and Commercial Strategy (UEDIN; M36). Report integrating the results of tasks 7.1 to 7.3 and from other WPs into guidance through the overall business opportunities associated with the effective development of wave energy converters associated with this technology.

Performance test results (se abrirá en una nueva ventana)

Performance test plan results and statement of system performance (EMEC). A final report with the overall WP results will be issued. It will include a matrix of test cases mapped to performance requirements with results.

CERS simulation in other systems (se abrirá en una nueva ventana)

Report on CERS simulation in other systems (WAVEC). After proving the efficiency of the system on a specific Wave Energy Converter, this report will present other technologies that could use the CERS braking module and what could be their gain doing so. A preliminary draft will be released, while the final document will be submitted with updated data after the model validation process.

Business case and adaptability of the CERS braking module technology (se abrirá en una nueva ventana)

Business case and adaptability of the CERS braking module technology (CPO; M30). Using results of WP2 and WP5, a supporting business case for the CERS braking module will be presented in a report.

Time Domain model description and verification report (se abrirá en una nueva ventana)

Time Domain model description and verification report (WAVEC). This document will describe the theory and implementation of the model and how the accurate functioning has been verified.

Risk register (se abrirá en una nueva ventana)

Risk register (EMEC). Project risk register will be created at the start and updated periodically along the project. The final Risk Register will be send to the EC at the end of the project.

Report RCM (Reliability Centered Maintenance) plan (se abrirá en una nueva ventana)

Report presenting RCM plan for heaving WECs, using a case study of CorPower buoy with CERS braking module and real data obtained within WaveBoost (EDP, M24). A preliminary report on the approach of Reliability Centered Maintenance (RCM) will be submitted in M24 by EDP, with a final version incorporating test results provided in M34.

Report on system reliability analysis (se abrirá en una nueva ventana)

Report on updated system reliability analysis after the performance testing (SP). A preliminary report on system reliability analysis after the reliability testing will be distributed internally.

Functional test results (se abrirá en una nueva ventana)

Functional test plan results (EMEC). Matrix of test cases mapped to functional requirements with results

Reliability testing finished, results database (se abrirá en una nueva ventana)

Reliability test report with failure database. (SP) Identified failure mechanisms for key components, system and components reliability data as well as design improvements incorporated through the test program.

Analysis of CERS PTO performance data (se abrirá en una nueva ventana)

Assessment of CERS performance data (WAVEC). This deliverable will present a summary of the findings obtained with the model as well as the boosting component effects. A preliminary report will be released while the final report will be submitted with updated data, after the model validation process.

Report on updated probabilistic VMEA (se abrirá en una nueva ventana)

Report on updated probabilistic VMEA after the performance testing (SP), based on reliability testing and probablistic method. A preliminary report describing the VMEA method and constraints will be distributed internally, and a final report on probablistic VMEA approach

Input data to techno-economic model (se abrirá en una nueva ventana)

Input data to techno-economic Model (UEDIN; M12). Based on estimated CERS braking module performance and initial results of WP6, LCOE, LCA and SCOE tools will be set up as starting point for techno-economic modelling.

Internal Progress Reports (se abrirá en una nueva ventana)

Internal progress reports (CPO). The first internal project report will be created at the start and progress reports will be updated periodically along the project. A final report assembly the internal progress reports will be sent to the EC at the end of the project.

Project website (se abrirá en una nueva ventana)

Project website (EMEC, M3). Launch of the project’s central communication tool.

Reliability test rig comissioning (se abrirá en una nueva ventana)

Commissioning of the Reliability test rig (CPO). The process and findings of the commissioning of the physical test rig will be presented, evidencing the delivery.

End of project workshop (se abrirá en una nueva ventana)

"End of project workshop (EMEC, M34). Engagement event with target stakeholders summarising and profiling the WaveBoost project. An Initial project workshop ""Engagement event with target stakeholders to obtain design input requirements"" will be organised by EMEC in M6."

Project videos (se abrirá en una nueva ventana)

Project videos (EMEC, M36). A video will be produced to present the final project results to the interested public. In M12, EMEC will produce a first video introducing the technology, goals, challenges and deliverables.

Functional toolset for condition monitoring (se abrirá en una nueva ventana)

Functional toolset for condition monitoring of CERS braking module in real sea operation (CPO). As intermediate step, a report presenting monitoring and maintenance methodology based on state-of-the-art in automotive and wind industry will be submitted by SP, including early stage recommendations for condition monitoring. This report will then be updated by CPO to incorporate the specifics of the system, and a final version with knowledge from the test results will be submitted by CPO after review by SP.

CERS operational risks and failure modes database (se abrirá en una nueva ventana)

Database of CERS braking module operational risks and failure modes (SP). A preliminary report presenting the initial FMECA will be submitted and another internal report representing the updated FMECA with experience from reliability testing. A final update with learning from the test program will be provided.