Advanced Braking Module with Cyclic Energy Recovery System (CERS) for enhanced reliability and performance of Wave Energy Converters

CORDIS bietet Links zu öffentlichen Ergebnissen und Veröffentlichungen von HORIZONT-Projekten.

Links zu Ergebnissen und Veröffentlichungen von RP7-Projekten sowie Links zu einigen Typen spezifischer Ergebnisse wie Datensätzen und Software werden dynamisch von OpenAIRE abgerufen.

Leistungen

Techno-economic analysis (öffnet in neuem Fenster)

Techno-economic analyses (UEDIN; M25). Report with estimate of improvement on the LCOE that the CERS braking module will provide within an existing PTO, including also LCA, SCOE and indicative values of energy per ton, energy per CAPEX and energy per OPEX.

Final recommendations and guidelines (öffnet in neuem Fenster)

Final recommendations and guidelines - Technical Development and Commercial Strategy (UEDIN; M36). Report integrating the results of tasks 7.1 to 7.3 and from other WPs into guidance through the overall business opportunities associated with the effective development of wave energy converters associated with this technology.

Performance test results (öffnet in neuem Fenster)

Performance test plan results and statement of system performance (EMEC). A final report with the overall WP results will be issued. It will include a matrix of test cases mapped to performance requirements with results.

CERS simulation in other systems (öffnet in neuem Fenster)

Report on CERS simulation in other systems (WAVEC). After proving the efficiency of the system on a specific Wave Energy Converter, this report will present other technologies that could use the CERS braking module and what could be their gain doing so. A preliminary draft will be released, while the final document will be submitted with updated data after the model validation process.

Business case and adaptability of the CERS braking module technology (öffnet in neuem Fenster)

Business case and adaptability of the CERS braking module technology (CPO; M30). Using results of WP2 and WP5, a supporting business case for the CERS braking module will be presented in a report.

Time Domain model description and verification report (öffnet in neuem Fenster)

Time Domain model description and verification report (WAVEC). This document will describe the theory and implementation of the model and how the accurate functioning has been verified.

Risk register (öffnet in neuem Fenster)

Risk register (EMEC). Project risk register will be created at the start and updated periodically along the project. The final Risk Register will be send to the EC at the end of the project.

Report RCM (Reliability Centered Maintenance) plan (öffnet in neuem Fenster)

Report presenting RCM plan for heaving WECs, using a case study of CorPower buoy with CERS braking module and real data obtained within WaveBoost (EDP, M24). A preliminary report on the approach of Reliability Centered Maintenance (RCM) will be submitted in M24 by EDP, with a final version incorporating test results provided in M34.

Report on system reliability analysis (öffnet in neuem Fenster)

Report on updated system reliability analysis after the performance testing (SP). A preliminary report on system reliability analysis after the reliability testing will be distributed internally.

Functional test results (öffnet in neuem Fenster)

Functional test plan results (EMEC). Matrix of test cases mapped to functional requirements with results

Reliability testing finished, results database (öffnet in neuem Fenster)

Reliability test report with failure database. (SP) Identified failure mechanisms for key components, system and components reliability data as well as design improvements incorporated through the test program.

Analysis of CERS PTO performance data (öffnet in neuem Fenster)

Assessment of CERS performance data (WAVEC). This deliverable will present a summary of the findings obtained with the model as well as the boosting component effects. A preliminary report will be released while the final report will be submitted with updated data, after the model validation process.

Report on updated probabilistic VMEA (öffnet in neuem Fenster)

Report on updated probabilistic VMEA after the performance testing (SP), based on reliability testing and probablistic method. A preliminary report describing the VMEA method and constraints will be distributed internally, and a final report on probablistic VMEA approach

Input data to techno-economic model (öffnet in neuem Fenster)

Input data to techno-economic Model (UEDIN; M12). Based on estimated CERS braking module performance and initial results of WP6, LCOE, LCA and SCOE tools will be set up as starting point for techno-economic modelling.

Internal Progress Reports (öffnet in neuem Fenster)

Internal progress reports (CPO). The first internal project report will be created at the start and progress reports will be updated periodically along the project. A final report assembly the internal progress reports will be sent to the EC at the end of the project.

Project website (öffnet in neuem Fenster)

Project website (EMEC, M3). Launch of the project’s central communication tool.

Reliability test rig comissioning (öffnet in neuem Fenster)

Commissioning of the Reliability test rig (CPO). The process and findings of the commissioning of the physical test rig will be presented, evidencing the delivery.

End of project workshop (öffnet in neuem Fenster)

"End of project workshop (EMEC, M34). Engagement event with target stakeholders summarising and profiling the WaveBoost project. An Initial project workshop ""Engagement event with target stakeholders to obtain design input requirements"" will be organised by EMEC in M6."

Project videos (öffnet in neuem Fenster)

Project videos (EMEC, M36). A video will be produced to present the final project results to the interested public. In M12, EMEC will produce a first video introducing the technology, goals, challenges and deliverables.

Functional toolset for condition monitoring (öffnet in neuem Fenster)

Functional toolset for condition monitoring of CERS braking module in real sea operation (CPO). As intermediate step, a report presenting monitoring and maintenance methodology based on state-of-the-art in automotive and wind industry will be submitted by SP, including early stage recommendations for condition monitoring. This report will then be updated by CPO to incorporate the specifics of the system, and a final version with knowledge from the test results will be submitted by CPO after review by SP.

CERS operational risks and failure modes database (öffnet in neuem Fenster)

Database of CERS braking module operational risks and failure modes (SP). A preliminary report presenting the initial FMECA will be submitted and another internal report representing the updated FMECA with experience from reliability testing. A final update with learning from the test program will be provided.