To ensure compliance with the provisions of the GDPR, a consent form template for project participants in TIGON’s pilot sites (Spain, France, Bulgaria and Finland) has been prepared. This form will be adapted to the specific needs of the respective pilot sites.
Project activities will contribute to the homogenization of the data, including the personal data. Continuous evaluation of the data that will be collected in each pilot site will take place and a re-assessment of whether a DPIA form is necessary. In the cases where the DPIA form is completed, the DPIA should be revised and updated if necessary, in the duration of the project.
SST device and DC/DC converters designs will be completed and manufactured to validate them in both demo-sites (France and Spain). Besides, central controller for the whole system will be designed and implemented. A generic server dedicated to the execution of protection and control algorithms will be used to centralize current and voltage measurements at multiple network locations, allowing the development of WAMPAC solution. Additionally, PV modules will be characterized and installed on french demo-site and a MV DC connected BESS system will be used in spanish demo-site.
During next stage of the project, WAMPAC system algorithms will be validated, hybrid grid models will be concluded, and a HIL test platform will be enabled with real smart meters and protections relays. The whole control architecture and the EMS control will be concluded and validated. Additionally, centralized and distributed EMS approaches will be compared through simulation. DSS will be improved and will allow adding new grid elements, based on cost and benefit analysis and demo-sites operation. Regarding cybersecurity, TIGON will provide a cyber-resilience plan and data integrity attack scenarios.
A monitoring plan to gather data required to asses pilots KPIs during demonstration phase will be established.
Exploitation strategy will consider the characterization of results, a preliminary exploitation roadmap and a patent analysis. The replication strategy will be adapted and refined to ensure the consecution of the project impacts considering the results from the demo-sites, the constructed business models and the related CBAs.
By the time the achievement of the first major project results and the start of the demo site activities, TIGON will be able pursue collaboration with other relevant targeted stakeholders, projects at physical BRIDGE events (when they occur) or at specific industry events.