Development of postcombustion CO2 capture with CaO in a large testing facility: “CaOling”

Objetivo

This project is aiming at the scaling-up of one of the most promising concepts for CO2 capture from coal power plants: postcombustion carbonate looping systems. This project focuses on the experimental pilot testing and scaling up of the process at scales in the 1 MW range. The 1 Mw carbonate looping pilot will be built in the Hunosa 50 Mwe CFB coal power plant of “La Pereda”, using a side stream of flue gases of the commercial plant. A parallel research program will be developed along the activities to design, build and test at the pilot, including research activities at lab-scale and fundamental knowledge on sorbent properties. This program will be developed by the scientific leaders in the development of this technology worldwide, and will help with the design of the pilot to a better understand of the results. The scope of this project is the necessary step towards a possible pre-industrial demo plant (10s of Mw scale) .This is clearly in line with the expected level of development for this technology outlined in the European Technology Platform for Zero Emission Fossil Fuel Power Plants and also with wider targets to accelerate the development of breaktrough technologies for CO2 capture under the EU Strategic Enegy Technology Plan.

Convocatoria de propuestas

FP7-ENERGY-2009-1
Consulte otros proyectos de esta convocatoria

Régimen de financiación

CP - Collaborative project (generic)

Coordinador

ENDESA GENERACION SA
Aportación de la UE
€ 813 707,00
Dirección
AV DE LA BORBOLLA 5
41004 Sevilla
España

Ver en el mapa

Región
Sur Andalucía Sevilla
Tipo de actividad
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Contacto administrativo
Andrés Sanchez-Biezma Sacristan (Mr.)
Enlaces
Coste total
Sin datos

Participantes (7)