Skip to main content
Ir a la página de inicio de la Comisión Europea (se abrirá en una nueva ventana)
español español
CORDIS - Resultados de investigaciones de la UE
CORDIS
Contenido archivado el 2024-06-18

Whole Life Rail Axle Assessment and Improvement

Objetivo

Axles for railway trains are carefully engineered and high value items that are designed to last 20 years or more. There is however a current trend for axles to be withdrawn from service before this because of corrosion on the surface long before their design lives. The decision to withdraw from service is taken without the full knowledge of the way in which the failure will result from corrosion, as this requires a crack to initiate and the mechanism for this is unknown. Cracks in axles can also initiate from ballast strikes and electrical faults. The failure rate is about 2 axles per year in the UK. If these withdrawals take place while a train is in-service there is a consequent significant cost associated while the train is out of service for additional maintenance. Inspection of the axles for cracking takes place at intervals set by knowledge of crack growth rates and inspection sensitivities. The most sensitive inspection methods are surface inspection methods designed for crack detection (such as MPI, eddy current and ACFM) and these do not typically attempt to measure the corrosion. However inspection of axles while the train is in service is still required and this is inconvenient and costly for the train operators. WOLAXIM aims to provide three new and better methods of crack detection and corrosion assessment for railway axle inspection. One method is for the exposed body of the axles (intended primarily for freight wagon or passenger trailing axles) and can be carried out automatically as the vehicles pass an inspection station that could be installed in carriage sidings or marshalling yards. A second method is specifically for the hollow axles of high speed trains and aims to improve the speed of the inspection and improve crack detection reliability. This could be deployed while the train is in depot overnight and without dismantling of the wheelset. The third method is to improve the measurement of corrosion and therefore the sentencing of corro

Programa(s)

Programas de financiación plurianuales que definen las prioridades de la UE en materia de investigación e innovación.

Tema(s)

Las convocatorias de propuestas se dividen en temas. Un tema define una materia o área específica para la que los solicitantes pueden presentar propuestas. La descripción de un tema comprende su alcance específico y la repercusión prevista del proyecto financiado.

Convocatoria de propuestas

Procedimiento para invitar a los solicitantes a presentar propuestas de proyectos con el objetivo de obtener financiación de la UE.

FP7-SME-2010-1
Consulte otros proyectos de esta convocatoria

Régimen de financiación

Régimen de financiación (o «Tipo de acción») dentro de un programa con características comunes. Especifica: el alcance de lo que se financia; el porcentaje de reembolso; los criterios específicos de evaluación para optar a la financiación; y el uso de formas simplificadas de costes como los importes a tanto alzado.

BSG-SME - Research for SMEs

Coordinador

TWI LIMITED
Aportación de la UE
€ 78 896,40
Dirección
GRANTA PARK GREAT ABINGTON
CB21 6AL Cambridge
Reino Unido

Ver en el mapa

Región
East of England East Anglia Cambridgeshire CC
Tipo de actividad
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Enlaces
Coste total

Los costes totales en que ha incurrido esta organización para participar en el proyecto, incluidos los costes directos e indirectos. Este importe es un subconjunto del presupuesto total del proyecto.

Sin datos

Participantes (8)

Mi folleto 0 0