Ground vibration, effected by rail services, is an important environmental concern, affecting European citizens nearby any rail infrastructure. Surveys show that many Europeans are subjected to annoying levels of feelable vibration and vibration-induced noise. Although solutions are available for track in tunnels, tracks at grade are a much more extensive problem even for vibration-induced noise. However, solutions for tracks at grade are lacking: for some problems currently no feasible solutions at reasonable cost are available.
A group of railway operators, infrastructure managers, infrastructure and rolling stock manufacturers, and construction companies, end users of vibration mitigation technology, have gathered, to propose a major project for Railway Induced Vibration Abatement Solutions (RIVAS). They aim at providing tools and methods to reduce vibration below the threshold of annoynace and induced noise below background levels by 2013.
The group includes the expertise of research organisations and universities with specialist laboratory and theoretical modelling facilities. The issues are treated in a holistic way with the focus on reducing the annoyance to lineside residents. The project examines all vibration effects and aspects of the system: vehicle, track, propagation, freight and high-speed rail services.
WP1 establishes the test procedures to monitor and control the performance of vibration mitigation measures under realistic conditions
WP2 develops and evaluates mitigation measures based on reducing the excitation of vibration at the vehicle–track interface by improved maintenance
WP3 develops and evaluates mitigation measures for ballasted and slab tracks
WP4 will develop and evaluate mitigation measures based on sub-grade improvement and ground barriers within the railway infrastructure
WP5 addresses the impact of the vehicle
Each of the solutions is to be validated with field tests on the major European rail networks represented in RIVAS

Programme(s)

Multi-annual funding programmes that define the EU’s priorities for research and innovation.

Topic(s)

Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.

Call for proposal

Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.

FP7-SST-2010-RTD-1
See other projects for this call

Funding Scheme

Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.

CP-IP - Large-scale integrating project

Coordinator

UNION INTERNATIONALE DES CHEMINS DE FER
EU contribution
€ 281 000,00
Total cost

The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.

No data

Participants (26)