Railway Induced Vibration Abatement Solutions

Obiettivo

Ground vibration, effected by rail services, is an important environmental concern, affecting European citizens nearby any rail infrastructure. Surveys show that many Europeans are subjected to annoying levels of feelable vibration and vibration-induced noise. Although solutions are available for track in tunnels, tracks at grade are a much more extensive problem even for vibration-induced noise. However, solutions for tracks at grade are lacking: for some problems currently no feasible solutions at reasonable cost are available.
A group of railway operators, infrastructure managers, infrastructure and rolling stock manufacturers, and construction companies, end users of vibration mitigation technology, have gathered, to propose a major project for Railway Induced Vibration Abatement Solutions (RIVAS). They aim at providing tools and methods to reduce vibration below the threshold of annoynace and induced noise below background levels by 2013.
The group includes the expertise of research organisations and universities with specialist laboratory and theoretical modelling facilities. The issues are treated in a holistic way with the focus on reducing the annoyance to lineside residents. The project examines all vibration effects and aspects of the system: vehicle, track, propagation, freight and high-speed rail services.
WP1 establishes the test procedures to monitor and control the performance of vibration mitigation measures under realistic conditions
WP2 develops and evaluates mitigation measures based on reducing the excitation of vibration at the vehicle–track interface by improved maintenance
WP3 develops and evaluates mitigation measures for ballasted and slab tracks
WP4 will develop and evaluate mitigation measures based on sub-grade improvement and ground barriers within the railway infrastructure
WP5 addresses the impact of the vehicle
Each of the solutions is to be validated with field tests on the major European rail networks represented in RIVAS

Programma(i)

Programmi di finanziamento pluriennali che definiscono le priorità dell’UE in materia di ricerca e innovazione.

Argomento(i)

Gli inviti a presentare proposte sono suddivisi per argomenti. Un argomento definisce un’area o un tema specifico per il quale i candidati possono presentare proposte. La descrizione di un argomento comprende il suo ambito specifico e l’impatto previsto del progetto finanziato.

Invito a presentare proposte

Procedura per invitare i candidati a presentare proposte di progetti, con l’obiettivo di ricevere finanziamenti dall’UE.

FP7-SST-2010-RTD-1
Vedi altri progetti per questo bando

Meccanismo di finanziamento

Meccanismo di finanziamento (o «Tipo di azione») all’interno di un programma con caratteristiche comuni. Specifica: l’ambito di ciò che viene finanziato; il tasso di rimborso; i criteri di valutazione specifici per qualificarsi per il finanziamento; l’uso di forme semplificate di costi come gli importi forfettari.

CP-IP - Large-scale integrating project

Coordinatore

UNION INTERNATIONALE DES CHEMINS DE FER
Contributo UE
€ 281 000,00
Costo totale

I costi totali sostenuti dall’organizzazione per partecipare al progetto, compresi i costi diretti e indiretti. Questo importo è un sottoinsieme del bilancio complessivo del progetto.

Nessun dato

Partecipanti (26)

Il mio fascicolo 0 0