Skip to main content
Go to the home page of the European Commission (opens in new window)
English English
CORDIS - EU research results
CORDIS

Defeat of Insider Theft in Nuclear and Radioactive Sites

Objective

"Insider threats are perhaps the most serious challenges that nuclear security systems face. All of the cases of theft of nuclear materials where the circumstances of the theft are known were perpetrated either by insiders or with the help of insiders; given that the other cases involve bulk material stolen covertly without anyone being aware the material was missing, there is every reason to believe that they were perpetrated by insiders as well.
The need is to detect shielded and unshielded Special Nuclear Materials (""SNM"") and radioactive materials is necessary. Radiation Monitors are effective to detect unshielded or partially shielded nuclear and radioactive materials in lightly loaded vehicles or cargos, and less effective at dense or high attenuating vehicles. In addition, the radiation monitors are not effective to detect shielding (e.g. lead) inside the vehicles that are capable to transport large masses of shielding material. Specifically, one of the biggest gaps is that some SNMs emit very low level of radiation. The X-ray cannot clear every dense object found in the image. Active interrogation can be used to clear the alarms; however, they produce high radiation that requires shielded facility, and require passengers not to remain in the vehicle during the inspection. Therefore, there is a need for inspection systems that can penetrate high attenuating vehicles, be specific to nuclear and shielding materials and that can be steal from the sites. . Lingacom is developing an innovative Muon Detection System for detecting high-Z materials used in nuclear bombs and shielded radioactive materials (used in “dirty bombs”) in containerized cargo and vehicles. The company has built a highly skilled and experienced team that has developed and demonstrated successfully key detection capabilities of high-Z materials including building a cost-effective muon detection proof of concept (PoC) prototype.
"

Fields of science (EuroSciVoc)

CORDIS classifies projects with EuroSciVoc, a multilingual taxonomy of fields of science, through a semi-automatic process based on NLP techniques. See: The European Science Vocabulary.

You need to log in or register to use this function

Programme(s)

Multi-annual funding programmes that define the EU’s priorities for research and innovation.

Topic(s)

Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.

Funding Scheme

Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.

SME-2 - SME instrument phase 2

See all projects funded under this funding scheme

Call for proposal

Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.

(opens in new window) H2020-SMEInst-2014-2015

See all projects funded under this call

Coordinator

LINGACOM LTD
Net EU contribution

Net EU financial contribution. The sum of money that the participant receives, deducted by the EU contribution to its linked third party. It considers the distribution of the EU financial contribution between direct beneficiaries of the project and other types of participants, like third-party participants.

€ 1 032 027,00
Address
10 HANECHOSHET STREET RAMAT HACHAYAL
69710 TEL AVIV
Israel

See on map

SME

The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.

Yes
Activity type
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Links
Total cost

The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.

€ 1 474 325,00
My booklet 0 0