NEW DIAPHRAGM WALL JOINT SYSTEM ALLOWING GREATER DEPTHS AND HIGH QUALITY JOINTS

Periodic Reporting for period 7 - TTMJ (NEW DIAPHRAGM WALL JOINT SYSTEM ALLOWING GREATER DEPTHS AND HIGH QUALITY JOINTS)

Berichtszeitraum: 2019-09-01 bis 2020-02-29

Guide tracks fixed on the pre-cast beams during tests
The slanted concrete beam after trimming
The concrete block after sawing. Visible the joint and the GFRP pipes
The trimmer suspended by the base carrier, ready to start the tests
Simplified sketch of the tension joint arrangement
Split tests runned by Politecnico of Milan on three sawed samples
The TTMJ trimmer machine
Principal roles of TTMJ project consortium members